3. All of the
place types available for the project are listed in the drop-down
menu underneath "Mark Place Type".
1. Enter the percent coverage of the place type being laid down. This represents the physical percentage of the acreage that is being redeveloped for the parcel.
2. Enter the percent development. This represents the density that the place type is applied at.
3. Enter the percent underbuild. This represents the hold out for streets, parks, etc.
4. Select a place type from the drop-down menu.
5. Click on the parcel you want to mark the place type to (Note: You can change the place type on multiple parcels by dragging a box across the parcels)
NOTE: Only parcels identified as existing development will be Redeveloped. Such parcels are flagged with an "X" in the Developed field of the .dbf. If vacant parcels are marked in Redevelopment Mode, they will be updated with the new Place Type, but will not be considered "Redeveloped."
|